SteelCorp, anticipating the future of civil construction.

Innovation, technology and management,
construction like you've never seen it before!

Industrialization as part
of the construction process

With the industrialization process, 40% of its work takes place outside the construction site, in a controlled factory environment that optimizes the use of resources and attests to the quality of the final product.
Volume of material transported up to 75% lower = lower logistics cost
High productivity due to controlled factory environment
Layout flexibility and ease of installation
Easy and quick maintenance without “breakdowns”
Lower wall thickness = increased usable area by up to 4%
Minimum waste = reduction in the volume of debris
6x lighter system = lower structure cost

Technology that translates
such as high productivity

Your project is built virtually in order to anticipate possible execution problems that are normally only identified during construction.

The methodology BIM (Building Information Modeling) boils down to creating a virtual model with technical information about the building.

This methodology, composed of different integrated tools, allows the collaboration of different professionals during the feasibility, planning, and execution of the project.

As BIM We are able to guarantee an early perception of possible complications or the need for maintenance during the life cycle of the project.

We increase the importance and usability of the project in order to reduce the chances of improvisation and consequently, the execution time of the work, improving performance and ensuring that the planned schedule and budget are respected.

Recent data collected by "McKinsey & Company" attest that low productivity in the construction sector costs US$ 1.6 TRILLION per year for the world economy, in other words, the current construction model urgently needs to be rethought so that this cost can be reversed in global economic growth. Think about it!

Comparing Masonry
with the Light Steel Frame

We are committed to the quality of your project and the environment,
Therefore, we will show the main differences in our construction process.

Light Steel Frame​

Acoustic insulation of up to 42db
Thermal insulation
Waste Generation (5x less)
CO2 emission in the ozone layer (5x lower)
Water Consumption (10x lower)
Tree Consumption (20x lower)

Masonry

Acoustic insulation of up to 30db
Thermal insulation
Waste Generation (rubble)
CO2 emission in the ozone layer
Water consumption
Tree Consumption
Estimated data considering projects carried out by SteelCorp, where in a construction of 811 m2 In addition to having greater thermal and acoustic comfort, you will generate 5 times less waste, emit 5 times less CO2 in the ozone layer, it will save more than 180 thousand liters of water and will also save more than 560 trees!

Construction standards are the
guarantee of a solid system

SteelCorp meets all construction standards applied to civil construction, ensuring that the light steel frame construction model is fully compatible with the market.

Construction process
well structured

SteelCorp's construction process is structured to provide maximum productivity, combining technology, industrialization and qualification for impeccable on-site assembly.
Foundation
Structure
Roof
External Closure
installations
Internal Closing
Finishing

Tracking in time
real with 24h cameras

Practicality in monitoring your work through an application where you can check the progress of the construction process, saving time and travel to the site. Follow all the steps, through images and information directly from the responsible engineer, in the palm of your hand!

Talk to a
specialist

Your construction can be faster, cleaner, more modern and sustainable and SteelCorp is prepared to take you to this new level.